AI data center timelines
Dated AI site milestones, including estimated future capacity and costs. Explore the original source values, notes and links alongside related tables. Figures may be estimates; this dated export is not a complete global inventory.
VISUAL EXPLORATION
Table preview is the curated default for this dataset.
TABLE PREVIEW
Loading preview…
METADATA
DATA DICTIONARY
Site or campus name; joins to data_center in epoch_ai_data_centers.
As-of date of the source milestone or chip record; may refer to an estimated future event.
Source narrative of construction progress at this milestone, including reasoning, uncertainty and citations.
Number of buildings operational by this milestone date, according to the source.
IT power capacity available to GPU servers, networking and storage, excluding facility overhead.
Total facility power capacity, including IT, cooling, lighting and other overhead; not energy consumption.
AI compute capacity expressed as equivalent NVIDIA H100 GPUs based on 8-bit OP/s.
Maximum AI compute capacity in a format of at least 8 bits; source estimates may infer chip counts from power.
Estimated total capital cost by this date, including IT hardware, facility equipment, buildings, labor and land.
Estimated capital cost of IT hardware including GPUs, networks and server racks.
Estimated capital cost excluding compute hardware, including buildings, electrical and cooling equipment, labor and land.
Estimated annual operating cost including energy, tax, maintenance, labor and water.
Estimated average water consumption in million gallons per day; source unit retained, no gallon-system conversion.
Repeated lookup of the site’s current compute at the export snapshot, not its value at this row’s milestone date.
PROVENANCE & LIMITATIONS
Run epoch-ai-data-centers-20261119. Human-supplied https://epoch.ai/data/data_centers/data_centers.zip, ZIP SHA-256 9fb68730427e3610d684ea46b4d05465063f5d1d928b63bb34f9a3589bedfefa; data_center_timelines.csv extracted unchanged. CSV SHA-256 83c4bffe13ead07957fdf3f0f28d8ee98bcc445b1e5e034b65ff9964548e7261. 575 input rows, 575 output rows, zero rows or columns removed. All source text retained, including Notes and Construction status. Header renaming, strict types and empty-cell nulls only. No labels or filled periods added. Field reference https://epoch.ai/data/data-centers-documentation/records. Decision docs/decisions/0018-epoch-ai-data-centers.md. Citation: Epoch AI, AI data centers, https://epoch.ai/data/ai-data-centers. Attribution and CC BY 4.0 apply.
Processing code: pipeline/sources/epoch_ai/process-data-centers.py
- A dated snapshot of selected AI infrastructure, not a complete global census. Coverage is concentrated in the United States; country counts do not measure total national capacity.
- Figures include estimates based on imagery, permits, company disclosures and other evidence. Past milestone dates do not establish that estimates were realized. Future values are uncertain and may change.
- No annual series, interpolation, extrapolation, or forecast/observed labels are generated. The latest timeline date is 2030-01-01 for one site only; most sites do not have milestones through 2030.
- Source Current fields are frozen at the export snapshot, not refreshed when CURRENT_DATE changes. They must not be summed across repeated timeline rows.
- MW denotes power capacity, not electricity consumption. IT power excludes cooling and facility overhead; total facility power includes them. Costs are estimates in billions of 2025 USD.
- Owner denotes chip ownership, not necessarily facility ownership. Text confidence markers, evidence, analysis and citations are retained verbatim; their claims remain those of the source and may become outdated.
- Empty cells are null, not zero or false. Comma-separated source labels have not been split or normalized. Source country names have no added ISO or region mapping.