AI data centers
Selected AI sites and campuses, with compute, IT power, costs and source evidence. Explore the original source values, notes and links alongside related tables. Figures may be estimates; this dated export is not a complete global inventory. Includes 96 sites in 12 countries, 77 in the United States.
VISUAL EXPLORATION
Loading visualization…
TABLE PREVIEW
Loading preview…
METADATA
DATA DICTIONARY
Source name of the site or campus.
AI compute capacity in H100-equivalents based on 8-bit OP/s, current at the export snapshot.
IT power capacity at the export snapshot, excluding cooling and facility overhead; not electricity consumption.
Estimated total capital cost at the export snapshot, in billions of 2025 USD.
Owner of the AI chips, not necessarily the facility owner or operator; source confidence markers retained.
AI compute users with source confidence markers; lists retained as source text.
Selected evidence and source links, retained verbatim including Markdown.
URL of Epoch AI’s supporting calculation spreadsheet.
Broader project containing this site, with source confidence markers if supplied.
Chip-type labels currently listed for the site at the export snapshot; source list preserved.
Source list of chip-type labels associated with this site; retained without expanding the list.
Financial backers linked to the site or project; source list preserved.
Companies involved in site construction; source list preserved.
Companies involved in power provision; source list preserved.
Source country label for the site; not normalized or assigned an ISO code.
Public-record street address as supplied; no geocoding performed.
PROVENANCE & LIMITATIONS
Run epoch-ai-data-centers-20261119. Human-supplied https://epoch.ai/data/data_centers/data_centers.zip, ZIP SHA-256 9fb68730427e3610d684ea46b4d05465063f5d1d928b63bb34f9a3589bedfefa; data_centers.csv extracted unchanged. CSV SHA-256 c3c68eceea0264eb0389d5e15e9e645fde2a8e69649d33353b6df825c0546d46. 96 input rows, 96 output rows, zero rows or columns removed. All source text retained, including Notes and Construction status. Header renaming, strict types and empty-cell nulls only. No labels or filled periods added. Field reference https://epoch.ai/data/data-centers-documentation/records. Decision docs/decisions/0018-epoch-ai-data-centers.md. Citation: Epoch AI, AI data centers, https://epoch.ai/data/ai-data-centers. Attribution and CC BY 4.0 apply.
Processing code: pipeline/sources/epoch_ai/process-data-centers.py
- A dated snapshot of selected AI infrastructure, not a complete global census. Coverage is concentrated in the United States; country counts do not measure total national capacity.
- Figures include estimates based on imagery, permits, company disclosures and other evidence. Past milestone dates do not establish that estimates were realized. Future values are uncertain and may change.
- No annual series, interpolation, extrapolation, or forecast/observed labels are generated. The latest timeline date is 2030-01-01 for one site only; most sites do not have milestones through 2030.
- Source Current fields are frozen at the export snapshot, not refreshed when CURRENT_DATE changes. They must not be summed across repeated timeline rows.
- MW denotes power capacity, not electricity consumption. IT power excludes cooling and facility overhead; total facility power includes them. Costs are estimates in billions of 2025 USD.
- Owner denotes chip ownership, not necessarily facility ownership. Text confidence markers, evidence, analysis and citations are retained verbatim; their claims remain those of the source and may become outdated.
- Empty cells are null, not zero or false. Comma-separated source labels have not been split or normalized. Source country names have no added ISO or region mapping.